首页> 美国政府科技报告 >Institutional/Management Analysis. Volume 2. Appendix. Phase I: Residual Energy Application Program at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio. Final Report
【24h】

Institutional/Management Analysis. Volume 2. Appendix. Phase I: Residual Energy Application Program at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio. Final Report

机译:机构/管理分析。第2卷。附录。第一阶段:俄亥俄州皮克顿朴茨茅斯气体扩散厂的剩余能源应用计划。总结报告

获取原文

摘要

The study requirements for a plan analysis session with the Urban Land Institute are presented. The following are also included: soil survey, floriculture case study, and economic benefits-regional impacts. The project directory and communications are included. (ERA citation 10:000833)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号