首页> 美国政府科技报告 >Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 8. Performance Analysis and Optimization. Executive Summary (Revised)
【24h】

Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 8. Performance Analysis and Optimization. Executive Summary (Revised)

机译:公路桥梁维护,修复和更换优化策略的制定,最终报告。第8卷。性能分析和优化。执行摘要(修订)

获取原文

摘要

The volume is the sixth of a six-volume final report and it presents the results of the research on bridge performance analyses and the development of an optimization model for bridge project selection. The titles of all six volumes are listed below: Vol. 1. Elements of Indiana Bridge Management System (IBMS); Vol. 2. A System for Bridge Structural Condition Assessment; Vol. 3. Bridge Traffic Safety Evaluation; Vol. 4. Cost Analysis; Vol. 5. Priority Ranking Method; and Vol. 6. Bridge Performance and Optimization.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号