首页> 美国政府科技报告 >Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 3. Bridge Traffic Safety Evaluation (Revised)
【24h】

Development of Optimal Strategies for Maintenance, Rehabilitation and Replacement of Highway Bridges, Final Report. Volume 3. Bridge Traffic Safety Evaluation (Revised)

机译:公路桥梁维护,修复和更换优化策略的制定,最终报告。第3卷。桥梁交通安全评估(修订)

获取原文

摘要

The report is the third of a six-volume final report presenting the findings of the part of the research work dealing with bridge traffic safety evaluation. A procedure was developed that can be used to determine the traffic safety index of a bridge on the basis of a set of contributing factors related to bridge, approach roadway and environmental conditions. The titles of all six volumes are listed below: Vol. 1. Elements of Indiana Bridge Management System (IBMS); Vol. 2. A System for Bridge Structural Condition Assessment; Vol. 3. Bridge Traffic Safety Evaluation; Vol. 4. Cost Analysis; Vol. 5. Priority Ranking Method; and Vol. 6. Bridge Performance and Optimization.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号