首页> 美国政府科技报告 >Retrofit Costs for Lime/Limestone FGD and Lime Spray Drying at Coal-Fired UtilityBoilers
【24h】

Retrofit Costs for Lime/Limestone FGD and Lime Spray Drying at Coal-Fired UtilityBoilers

机译:燃煤电站锅炉石灰/石灰石FGD和石灰喷雾干燥的改造成本

获取原文

摘要

The paper gives results of a research program the objective of which was tosignificantly improve engineering cost estimates currently being used to evaluate the economic effects of applying SO2 controls to existing coal-fired utility boilers. The costs of retrofitting conventional lime/limestone wet flue gas desulfurization (L/LS FGD) and lime spray drying (LSD) FGD at 100-200 coal-fired power plants are being estimated under this program. The retrofit capital cost estimating procedures used for L/LS FGD and LSD FGD make two cost adjustments to current procedures used to estimate FGD costs: cost adders (for items not normally included in FGD system costs; e.g., demolition and relocation of existing facilities) and cost multipliers (to adjust capital costs for site access, congestion, and underground obstructions).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号