首页> 美国政府科技报告 >Assessment of Experimental Longwall Recovery Rooms for Increasing Productivity and Expediting Equipment Removal Operations
【24h】

Assessment of Experimental Longwall Recovery Rooms for Increasing Productivity and Expediting Equipment Removal Operations

机译:评估实验性长壁回收室以提高生产率和加快设备拆除操作

获取原文

摘要

The U.S. Bureau of Mines, in cooperation with a southwestern Pennsylvania coal mining company, BethEnergy, Inc., Mine No. 60, Eighty-Four, PA, recently assessed the feasibility of using predriven recovery rooms (open entry recovery) during longwall mining to increase the productivity of the coal extraction process. Two recovery entries, one 200 ft long and another 600 ft long, were supplementally supported with bolts, channels, and wire mesh, and either fly ash-cement piers or fiber cribs, then mined into by the longwall face. The recovery entries showed little deterioration as the supports provided adequate resistance to the front abutment loading. Compared with conventional recovery methods, the fullface recovery room allowed for panel extraction to be completed nearly 17 days faster and to reduce face equipment move time by 1 1/2 days. The potential productivity increase accompanying recovery rooms is greater than the cost of supporting a fullface recovery room. The fullface recovery room provided over 18 additional production days and the opportunity to mine early 68,400 st of coal per year per panel mined.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号