首页> 美国政府科技报告 >Preliminary Site Visit Report, UOP (Universal Oil Products) Engineering Offices, Control Technology Assessment of Petroleum Refinery Operations, Des Plains, Illinois, June 2, 1982
【24h】

Preliminary Site Visit Report, UOP (Universal Oil Products) Engineering Offices, Control Technology Assessment of Petroleum Refinery Operations, Des Plains, Illinois, June 2, 1982

机译:UOp(通用油品)工程办公室,石油炼油厂运营控制技术评估,1982年6月2日,伊利诺伊州德斯普莱恩斯的初步现场访问报告

获取原文

摘要

A visit was made to Universal Oil Products, Inc. (UOP), Des Plaines, Illinois to assess the control methods used at this facility to protect workers from harmful exposures to chemical and physical agents. Specific attention was given to control methods for hydrogen-fluoride (7664393) (HF) alkylation units. Engineering controls included curbs around equipment to prevent acid spills from contaminating surrounding areas, the drainage of surface liquids into a neutralization pit, the scrubbing of all vent streams leaving the HF units with a potassium-hydroxide scrubber to neutralize any HF present, the provision of emergency shower booths, and the installation of a sieve dryer to remove water in entering feed. A point was developed for joints, flanges, and valves of the alkylation unit; originally the paint was orange, but on exposure to HF it turned bright yellow. Protective clothing offered included face shields, gauntlets, rubbers, booths, acid resistant jackets, overalls, acid hoods, or complete pressurized suits. Work practices were carefully rehearsed so as to avoid accidental exposures. Workers were trained in safety measures, spill cleanups and washdowns, how to neutralize, and proper equipment tagging procedures. Additional information was provided concerning emergency booths, the use of protective clothing, alkylation change houses, and safety procedures.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号