首页> 美国政府科技报告 >Dead Line Testing of Pantographs on the RTT Catenary System
【24h】

Dead Line Testing of Pantographs on the RTT Catenary System

机译:RTT接触网系统受电弓的死线测试

获取原文

摘要

The tests described in this report were carried out by the Transportation Test Center to verify the newly constructed overhead catenary system on the Railroad Test Track (RTT) and the pantographs to be used on it. The data produced included height and stagger measurements in support of the construction, also pantograph and catenary data up to speeds of 120 mi/h. The experimental techniques consisted of running specially instrumented pantographs over the catenary which was isolated and grounded (dead line). The TTC pantograph test car DOTX 211 was used to carry the pantographs. The results of these tests showed that instrumented pantograph techniques can successfully be employed in support of catenary construction. The results of the high speed pantograph tests showed that the new style 5 catenary proposed for the New Haven to Boston section of the Northeast Corridor has much improved performance over the existing catenary designs. It was also found that the dual stage Faiveley pantograph performed better than the single stage Faiveley. It was concluded that the complete RTT catenary installation was suitable for operating speeds up to 120 mi/h.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号