首页> 美国政府科技报告 >Development of Risk-Benefit-Cost Analysis for Policy Formulation (With Analysis of LNG Operations as a Case Study)
【24h】

Development of Risk-Benefit-Cost Analysis for Policy Formulation (With Analysis of LNG Operations as a Case Study)

机译:制定政策制定的风险 - 效益 - 成本分析(以液化天然气运营分析为例)

获取原文

摘要

The methodology developed and presented in the report focuses on broad public policy issues related to the management of risks. Chapters 1 and 2 examine the usefulness of economic tools for dealing with societal risks, particularly those with a low probability of occurrence and high consequence in terms of morbidity and mortality, and provide a theoretical framework for application of a cost/benefit analysis. Criteria are established for evaluating decision processes concerned with these risks. The transport of liquefied natural gas (LNG) is used as a case study. Chapters 3 to 6 examine current policies and regulations of hazardous materials handling by the Federal government; present the salient functions of LNG operations and associated risks; apply the established criteria to LNG operations; and contrast the current LNG risk management practice with these criteria. Also included are the names and addresses of individuals interviewed during the study.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号