Staff Discussion of Twelve Additional Technical Issues Raised by Responses to November 3, 1976Memorandum from Director,NRR to NRR Staff.

机译:工作人员讨论了对1976年11月3日NRR主任对NRR工作人员的答复提出的12项其他技术问题。

获取原文

摘要

Twelve additional issues relating to the NRC licensing process are addressed. These issues include:automatic resetting of reactor-trip-system (RTS) bistable relays,passive mechanical valve failures,electrical cable penetrations of reactor containment,analysis of the interaction of structures and the supporting soil,completeness of the review of plants referencing RESAR-3,instruments for monitoring both radiation and process variables during accidents,systematic review of normal plant operation and control system failures,integrity of steam generator tubes,improving the availability of offsite power,qualification of safety-related equipment,improvement of BWR shutdown reactivity performance,effects on utility transmission systems of the explosion of a large nuclear weapon.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号