首页> 美国政府科技报告 >Proposed Dredging, Community Dock, Bank Stabilization, and Boat Ramp at Mile 7.3, Right Bank, Elk River, Wheeler Reservoir, Limestone County, Alabama. Final Environmental Assessment
【24h】

Proposed Dredging, Community Dock, Bank Stabilization, and Boat Ramp at Mile 7.3, Right Bank, Elk River, Wheeler Reservoir, Limestone County, Alabama. Final Environmental Assessment

机译:建议疏浚,社区码头,银行稳定和船坡在英里7.3,右岸,麋鹿河,惠勒水库,石灰石县,阿拉巴马州。最终的环境评估

获取原文

摘要

;Contents: Purpose and Need For Project ( Background, Decision Required, Other Approvals Required); Public Involvement Process; Environmental and Public Interest Factors Considered ( Introduction, Physical/Chemical Characteristics and Anticipated Changes, Biological Characteristics and Anticipated Changes, Human Use Characteristics and Anticipated Impacts, Cumulative and Secondary Impacts); Alternatives ( Introduction, Description of Alternatives, Comparison of Alternatives, Special Permit Conditions); Literature Cited; List of Preparers.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号