首页> 美国政府科技报告 >Kingston Fossil Plant-Annual Ash Pond Dike Stability Inspection, FY 2008
【24h】

Kingston Fossil Plant-Annual Ash Pond Dike Stability Inspection, FY 2008

机译:金斯敦化石厂 - 年度灰池堤防稳定性检验,2008财政年度

获取原文

摘要

The waste disposal areas at Kingston Fossil Plant were inspected for dike structural stability on December 4 2007. The inspection was performed by Jamey Dotson (EDS) and Brian Lankford (CCBP) with Linda Campbell (KIF) being present for a portion of the inspection. The previous annual inspection was performed on November 21 2006. The results of the annual inspection are listed below according to location.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号