首页> 美国政府科技报告 >Air Traffic Control Modernization: FAA (Federal Aviation Administration) Faces Challenges in Managing Ongoing Projects, Sustaining Existing Facilities, and Introducing New Capabilities
【24h】

Air Traffic Control Modernization: FAA (Federal Aviation Administration) Faces Challenges in Managing Ongoing Projects, Sustaining Existing Facilities, and Introducing New Capabilities

机译:空中交通管制现代化:Faa(联邦航空管理局)在管理正在进行的项目,维持现有设施和引入新功能方面面临挑战

获取原文

摘要

This report provides the results of our review of the Federal Aviation Administrations (FAA) major acquisitions. At the request of the Chairman and Ranking Member of the House Committee on Transportation and Infrastructure, we updated our May 2005 status report on FAAs major acquisitions and examined how projects are impacted by plans for the Next Generation Air Transportation System (NextGen). Our objectives were to examine (1) overall trends affecting FAAs Facilities and Equipment (F&E) or capital account, (2) recent changes in cost and schedule baselines of FAAs major acquisition programs, and (3) the effect of NextGen plans on existing projects. Our review examined 18 projects valued at $17.5 billion in capital costs. These projects include developing new automated controller tools, acquiring new technologies to prevent accidents on runways and taxiways, and modernizing FAA facilities that manage large segments of airspace over the Atlantic and Pacific oceans. We performed this audit in accordance with generally accepted Government Auditing Standards as prescribed by the Comptroller General of the United States.

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号