首页> 美国政府科技报告 >Unpredictable Life Cycle of a Coal Pillar
【24h】

Unpredictable Life Cycle of a Coal Pillar

机译:煤柱的不可预测的生命周期

获取原文

摘要

A unique circumstance created by monitoring a pre-driven longwall recovery room permitted measuring the stresses of a coal pillar throughout its entire life cycle in less than a week. A fender pillar, created in approximately the middle of a longwall panel at a depth of 650 ft, transformed from a solid barrier pillar - to a yielding pillar - to a residual pillar as 3 ft slices were methodically removed with the longwall shearer. The complete transformation, or life cycle, took place in less than 12 hours. The stresses were quickly transferred from the pillar onto the standing pumpable concrete supports and into the outby pillars. Roof to floor closure measurements, combined with the timing of the pillar behavior, provides a detailed look at the uncontrollable convergence of underground mine openings. Pillars remain the most important form of primary support and understanding these life cycles is vital for safe and efficient mine design, in both room and pillar and longwall panel extractions.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号