首页> 美国政府科技报告 >Site Investigation of Bridges on and Over the Parkways in Western Kentucky; Final rept
【24h】

Site Investigation of Bridges on and Over the Parkways in Western Kentucky; Final rept

机译:西肯塔基州公园大桥上和桥上的桥梁现场调查;最终的评论

获取原文

摘要

Determination of the seismic risk of the bridges on and over the parkways in Western Kentucky requires evaluating the current condition of the individual elements of the bridges. Except for culverts, all bridges were visually inspected, photographed and the records were stored in a database. Data of the visual inspection and the photographs were combined to form the completed site inspection forms. Any visually observed deficiencies of the bridge elements were recorded. A Compact Disc (CD) that includes pictures of the bridges is attached to this report. The site inspection forms of all bridges on and over the parkways in Western Kentucky are combined with the bridge inventory to determine statistical figures regarding the characteristics of the bridges. The site inspection forms are an invaluable source that provides images of the existing conditions, assists in pre-earthquake preparation plans, and forms the basis to develop post-earthquake emergency response, inspection, and evaluation plans.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号