首页> 美国政府科技报告 >Investigation of Settlement at Bridge Approach Slab Expansion Joint: Survey and Site Investigations
【24h】

Investigation of Settlement at Bridge Approach Slab Expansion Joint: Survey and Site Investigations

机译:桥梁引桥板膨胀节沉降调查:勘察与现场调查

获取原文

摘要

Researchers investigated the bump at the end of the bridge by conducting a literature survey, distributing a questionnaire to the 25 districts of the Texas Department of Transportation, and by investigating two bridge sites in Houston, Texas. Some of the most important conclusions from the surveys are: (1) on the average, 25 percent of all bridges in the USA are affected by the bump problem; this is also the number for Texas bridges; (2) the maintenance cost for the bump problem in the USA is estimated at 100 million dollars per year (1997) and 6.3 million dollars per year in Texas (2001); (3) a tolerable bump has a slope of 1/200 or less; (4) in Texas, the number one reason for the bump is the settlement of the embankment fill followed by the loss of fill by erosion; (5) the problem is worse when the embankment is high and the fill is clay; and (6) the problem is minimized when an approach slab is used and the fill behind the abutement is cement stabilized. The investigations at the two bridge sites with significant bumps indicated that: (1) the soil near the abutment was weaker and wetter than the soil away from the abutement; (2) the soil near the abutment had a relatively high PI for an embankment fill; and (3) there were no voids under the pavement.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号