首页> 美国政府科技报告 >Reservoir Engineering and Treatment Design Technology: Topical Well Report.Comprehensive Study Well 5 (CSW 5), Peake Energy, Inc., PKE 753, Jackson County, WV. Topical Report, June 1988-December 1990
【24h】

Reservoir Engineering and Treatment Design Technology: Topical Well Report.Comprehensive Study Well 5 (CSW 5), Peake Energy, Inc., PKE 753, Jackson County, WV. Topical Report, June 1988-December 1990

机译:油藏工程和处理设计技术:局部井报告。综合研究井5(CsW 5),peake Energy,Inc.,pKE 753,Jackson County,WV。专题报告,1988年6月至1990年12月

获取原文

摘要

The objectives of the research conducted in the Comprehensive Study Well programwere (1) to develop a better understanding of the geologic controls on production, (2) to identify prospective completion zones by developing new or refining existing formation evaluation tools, and (3) to improve stimulation practices and reservoir description in the Devonian Shales. The CSW 5 was drilled and completed in the Rhinestreet and Lower Huron intervals of the Devonian Shales . All of the planned CSW research operations were conducted on this well including air-filled-hole and liquid-filled-hole logs, whole coring, wellsite geochemical analysis, cased-hole stress test and production logs, breakdown and

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号