首页> 外文OA文献 >REDESIGN LAYOUT WORKSTATION PROSES INJECTION MOLDING BERDASARKAN WORKLOAD ANALYSIS DAN PROSES SIMULASI PADA PEMBUATAN KOMPONEN LCDTV
【2h】

REDESIGN LAYOUT WORKSTATION PROSES INJECTION MOLDING BERDASARKAN WORKLOAD ANALYSIS DAN PROSES SIMULASI PADA PEMBUATAN KOMPONEN LCDTV

机译:基于工作量分析和仿真过程的重新设计布局工作站注塑过程制作LCDTV组件

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Abstract Productivity improvement of the company can be reach with many effort, which are minimizing waste, improving the utility of operator, and also redesigning layout facilities. Based on the observation, idle time of operator for the injection process is 30 minutes. If the delay will be compare with the company losses, it is equal to IDR. 1.001.700/operator/month. Based on this problem, redesign of the facilities layout is a solution to improve utilities and workload of operator. The result of this research, alternative layout has design based on simulation and the analysis of Activity Relationship Chart (ARC). It could be minimized the material handling 49.4 meters and 42.9 seconds. For the financial analysis, it can be minimized the labour cost IDR 14.684.670/month and also the material handling cost at least IDR 54.262/month.
机译:摘要公司的生产率改进可以达到许多努力,这些努力最小化浪费,改善操作员的效用,以及还重新设计布局设施。基于观察,注射过程的操作员的空闲时间为30分钟。如果延迟将与公司损失进行比较,则等于IDR。 1.001.700 /运营商/月。基于此问题,重新设计设施布局是一种改进运营商的实用程序和工作量的解决方案。该研究的结果,替代布局基于模拟和活动关系图(ARC)分析的设计。它可以最小化物料处理49.4米和42.9秒。对于财务分析,它可以最大限度地减少劳动力成本IDR 14.684.670 /月,并将物料处理成本至少为IDR 54.262 /月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号