首页> 外文OA文献 >One-machine batching and sequencing of multiple-type items
【2h】

One-machine batching and sequencing of multiple-type items

机译:单机分批排序多种物料

摘要

We consider a single-machine scheduling problem in which a given number of simultaneously available items of different types are to be processed. The items must first be batched and then sequenced before processing begins. Only items of the same type can be batched together. A setup time is incurred whenever a batch of a certain type of item is formed. The flowtime of an item in a batch is defined as the completion time of the batch that contains it. The problem is to find an optimal schedule in terms of the optimal batching and sequencing decisions that minimizes the total item flowtime. We present a dynamic programming algorithm to solve this problem. The algorithm has a running time polynomial in the number of items but exponential in the number of types.
机译:我们考虑单机调度问题,其中要处理给定数量的同时可用的不同类型的项目。必须先对物料进行批处理,然后再进行排序,然后再开始处理。只能将相同类型的项目一起批处理。每当形成一批特定类型的物料时,都会产生准备时间。批次中项目的流转时间定义为包含该项目的批次的完成时间。问题是要根据最佳的配料和排序决策找到最佳的时间表,以最大程度地缩短总物料流时间。我们提出了一种动态规划算法来解决这个问题。该算法的项数具有运行时间多项式,而类型数具有指数。

著录项

  • 作者

    Cheng TCE; Chen ZL; Oguz C;

  • 作者单位
  • 年度 1994
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号