首页> 外文OA文献 >Study of two alternative construction methods for expressway section trought Škocjanski hill : cutand cover vs. drill and blast tunell
【2h】

Study of two alternative construction methods for expressway section trought Škocjanski hill : cutand cover vs. drill and blast tunell

机译:高速公路Škocjanski山区的两种替代施工方法研究:挖方覆盖与钻探爆破

摘要

The thesis presents the feasibility study of two variants of construction of expressway Koper - Dragonja through the Škocjanski hill. Two alternatives - the cut & cover tunnel and drill and blast tunnel - are compared from technical and economical point of view.udThe theoretical introduction brings the overview of technical solutions for tunnel construction under shallow overburden. Examples of completed projects in Slovenia are presented and selected theoretical topics from rock mechanics are briefly described.udThe following chapter brings the description of road parameters and geological and geomechanical properties of defined sector. On the basis of technical calculations the support and dimensions of structural elements are selected for cut & cover tunnel and for drill and blast tunnel according to Eurocode standard. Cost estimation was made for both variants.udOn the basis of presented technical and economic analyses we can conclude that drill and blast tunnel is better choice than cut & cover tunnel.udud
机译:本文提出了通过Škocjanski丘陵建设Koper-Dragonja高速公路的两种变体的可行性研究。从技术和经济角度比较了两种选择方案-挖盖隧道和钻爆隧道。 ud理论介绍对浅埋层隧道的技术解决方案进行了概述。介绍了斯洛文尼亚已完成项目的示例,并简要介绍了岩石力学中选择的理论主题。 ud下一章介绍了路段参数以及定义区域的地质和地质力学特性。在技​​术计算的基础上,根据Eurocode标准为切割和覆盖隧道以及钻探和爆破隧道选择了结构元件的支撑和尺寸。根据两种技术的成本估算。 ud根据介绍的技术和经济分析,我们可以得出结论,钻孔和爆破隧道比切割和覆盖隧道更好。

著录项

  • 作者

    Kulovec Uroš;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"sl","name":"Slovene","id":39}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号