首页> 外国专利> Long Span Composite Beam And Long Span Structure Construction Method Using The Same

Long Span Composite Beam And Long Span Structure Construction Method Using The Same

机译:大跨度组合梁及使用该组合梁的大跨度结构施工方法

摘要

The present invention relates to a long span structure for securing a large space of a pillar, and is constructed by allowing a slab structure to be constructed while maintaining a shape in which the steel beam is bent upward from the center so as to correspond to the stress form received by the beam member in the building structure. Prevents the deflection of the beam in the state of securing the main long span (primary resistance), and even if the deflection occurs in the center of the steel beam constructed in the above bending state by the load applied to the slab later, it does not sag downward but will be flattened. Since it is only (secondary resistance), it relates to a long span structure and a construction method of a long span structure that does not lead to a decrease in durability of a building. The present invention is "steel frame beam composed of an upper and lower flanges and webs; A lower surface concrete coated on an intermediate region of a lower surface flange of the steel beam; And upper concrete covered at both ends of the upper flange of the steel beam. It provides a long span composite beam comprising a. In addition, the present invention "(a) installing the composite beam of claim 1 between the pillar members; (b) deriving a curvature inflection point when the composite beam is bent at a bending rate to correspond to a stress form received by the center and both ends of the beam member of the building structure; (c) disposing a hydraulic jack at the center of the composite beam and below the curvature inflection points on both sides; (d) pushing up the composite beam with the hydraulic jack, and bending the composite beam at a bending rate to correspond to the stress forms received by the center and both ends of the structural structure beam member; (e) While maintaining the pressing force of the hydraulic jack, a copper bar with a height adjusted under the composite beam is installed, and the height of the copper bar is adjusted according to the shape of the composite beam, so that the copper bar supports the composite beam and is curved. Installing to maintain, and recovering the hydraulic jack; And (f) pouring and curing the concrete covering the composite beam as a whole and the slab concrete on the top of the composite beam, and then dismantling the copper bar. A method of constructing a long span structure including the same is provided.
机译:本发明涉及一种用于确保支柱的较大空间的大跨度结构,并且通过允许在保持钢梁从中心向上弯曲的形状的同时允许构造钢坯结构的方式来构造,以与钢梁相对应。梁构件在建筑结构中承受的应力形式。防止在确保主长跨度(一次阻力)的状态下梁的挠曲,即使挠曲发生在以上述弯曲状态构造的钢梁的中心,随后由于施加到板坯上的载荷而发生挠曲不会下垂,但会变平。由于仅(二次电阻),因此涉及不会导致建筑物的耐久性降低的大跨度结构和大跨度结构的施工方法。本发明是“由上,下凸缘和腹板组成的钢框架梁;在钢梁的下表面凸缘的中间区域上涂覆的下表面混凝土;以及在上梁的上凸缘的两端覆盖的上混凝土”。提供了一种大跨度的组合梁,包括:a。另外,本发明“(a)将权利要求1的组合梁安装在支柱构件之间;以及(b)当复合梁以一定弯曲速率弯曲时,得出曲率拐点,以对应于建筑结构梁构件的中心和两端所承受的应力形式; (c)在组合梁的中心和两侧曲率拐点的下方布置一个液压千斤顶; (d)用液压千斤顶将组合梁向上推,并以一定的弯曲速率弯曲该组合梁,以使其对应于结构梁构件的中心和两端所承受的应力形式; (e)在保持液压千斤顶的按压力的同时,安装在复合梁下调整高度的铜条,并根据复合梁的形状调整铜条的高度,从而使铜条支撑复合梁并弯曲。安装维护和恢复液压千斤顶; (f)浇筑并固化覆盖整个复合梁的混凝土,并在复合梁的顶部浇注板状混凝土,然后拆除铜条。提供一种构造包括该结构的大跨度结构的方法。

著录项

  • 公开/公告号KR1021076660000B1

    专利类型

  • 公开/公告日2020-05-07

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020180139932

  • 发明设计人 이경훈;

    申请日2018-11-14

  • 分类号

  • 国家 KR

  • 入库时间 2022-08-21 10:57:13

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号