The present invention relates to a method for providing and assembling scaffolding units, each of which will be assembled from individual scaffolding components (of a scaffolding system) for constructing an industrial plant, in particular a petroleum refinery, comprising the following steps: a) Providing a 3D construction plan of the industrial plant; b) Providing a construction schedule for the industrial plant in order of occurrence, depicting the individual sections/phases of construction of the industrial plant to be realized simultaneously and/or successively; c) Selecting and drawing of scaffolding units to be used in the individual sections or phases of construction of the industrial plant in the 3D construction plan; d) Specifying the erection time required to erect the respective scaffolding unit; e) Specifying the dismantling time required to dismantle the respective scaffolding unit; f) Dividing the construction schedule into time intervals; g) Calculating for every single time interval, while taking into consideration the erection and dismantling times of the scaffolding units, the respective number of scaffolding components of identical design which are used simultaneously; h) Determining the maximum number of scaffolding components of identical design which are used simultaneously across all time intervals; i) Providing, for constructing the industrial plant, the maximum number of scaffolding components of identical design alone, or providing the maximum number of scaffolding components of identical design including a defined number of a buffer of scaffolding components of identical design; j) Beginning of assembly of the scaffolding units to be used in a respective phase of construction from the scaffolding components each required for this purpose on-site at a point in time chosen in dependency of the specified erection time each at the latest prior to a start of construction in the respective section of construction specified in the construction schedule.
机译:本发明涉及一种用于提供和组装脚手架单元的方法,其每一个都将由(脚手架系统的)单个脚手架组件组装而成,用于建造工业工厂,特别是石油精炼厂,包括以下步骤:a)提供工业厂房的3D施工计划; b)按发生顺序提供工厂的施工时间表,描述要同时和/或相继实现的工厂的各个部分/阶段; c)选择和绘制要在3D施工计划的工厂的各个部分或施工阶段中使用的脚手架单元; d)指定架设各个脚手架单元所需的架设时间; e)指定拆卸各个脚手架单元所需的拆卸时间; f)将施工时间表划分为时间间隔; g)在考虑到脚手架单元的安装和拆卸时间的同时,针对每个单个时间间隔进行计算,同时使用相同设计的脚手架组件的相应数量; h)确定在所有时间间隔内同时使用的相同设计的脚手架部件的最大数量; i)为建造工厂而单独提供最大数量的相同设计的脚手架组件,或提供最大数量的相同设计的脚手架组件,包括定义数量的相同设计的脚手架组件缓冲区; j)在各个施工阶段中使用的脚手架单元,从每个为此目的所需的脚手架组件的现场安装开始,该时间点是根据指定的安装时间而选择的,每个时间点最迟应在安装之前在施工时间表中指定的各个施工阶段开始施工。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号