INTEGRATED CONSTRUCTION WORK INTEGRATED SCHEDULE PLANNING METHOD USING VERTICAL RELATION AND HORIZONTAL RELATION, PROGRAM FOR EXECUTING SAME, AND COMPUTER READABLE RECORDING MEDIUM
INTEGRATED CONSTRUCTION WORK INTEGRATED SCHEDULE PLANNING METHOD USING VERTICAL RELATION AND HORIZONTAL RELATION, PROGRAM FOR EXECUTING SAME, AND COMPUTER READABLE RECORDING MEDIUM
Provided are an integrated construction work integrated schedule planning method using a vertical relation and a horizontal relation, and a program and computer readable recording medium therefor. According to the present invention, an integrated schedule plan is set by setting an order for each construction in each subdivision by using a vertical relation and a horizontal relation to set each subdivision-construction order.;COPYRIGHT KIPO 2020