首页> 外国专利> INTEGRATED CONSTRUCTION WORK INTEGRATED SCHEDULE PLANNING METHOD USING VERTICAL RELATION AND HORIZONTAL RELATION, PROGRAM FOR EXECUTING SAME, AND COMPUTER READABLE RECORDING MEDIUM

INTEGRATED CONSTRUCTION WORK INTEGRATED SCHEDULE PLANNING METHOD USING VERTICAL RELATION AND HORIZONTAL RELATION, PROGRAM FOR EXECUTING SAME, AND COMPUTER READABLE RECORDING MEDIUM

机译:使用垂直关系和水平关系,执行相同程序的程序以及计算机可读记录介质的集成建筑工程集成计划计划方法

摘要

Provided are an integrated construction work integrated schedule planning method using a vertical relation and a horizontal relation, and a program and computer readable recording medium therefor. According to the present invention, an integrated schedule plan is set by setting an order for each construction in each subdivision by using a vertical relation and a horizontal relation to set each subdivision-construction order.;COPYRIGHT KIPO 2020
机译:提供了一种使用垂直关系和水平关系的综合建筑工程综合进度计划方法,以及用于该综合方法的程序和计算机可读记录介质。根据本发明,通过使用垂直关系和水平关系为每个分区中的每个建筑设置顺序来设置每个分区-建筑顺序,来设置综合进度计划。COPYRIGHT KIPO 2020

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号