首页>
外国专利>
1. A real-time monitoring and analysis system for labor resources in the implementation and operation stages. The system uses micro control chips for construction projects.
1. A real-time monitoring and analysis system for labor resources in the implementation and operation stages. The system uses micro control chips for construction projects.
展开▼
机译:1.在实施和运营阶段的劳动力资源实时监控和分析系统。该系统使用微控制芯片进行建设项目。
展开▼
页面导航
摘要
著录项
相似文献
摘要
(b) Real time resource monitoring system in construction phase and construction project; oacute; N, in construction phase and amp; oacute; N, later in operation phase; oacute; N, providing CI amp information; oacute; N, labor hours by department, level and real-time working time; oacute; N, labor hours by Department, level and real-time working time; oacute; N, which provides CI amp information; oacute; N, labor hours by department, level and real-time working time; oacute; N, provides CI amp information; OA; There, microchip electronics and amp; oacute; Nico que apar amp; Aacute; locations and amp; oacute; are used to monitor resources at every moment of the workday. Yes, yes, yes1. Use microchips with Tama amp; ntilde; O and weight, which can be placed in a protection and provincial team; oacute; eacute; n por amp; Aacute; for workers belonging to the control camp; oacute; n.las amp; ntilde; in supplies to monitor their location; oacute; n; From each microchip ser amp; Aacute; N, received through receiving antennas installed in specific and amp departments; Aacute; Iacute; buildings, the goal is to cover the project departments 100%. The recorded data is sent to a private cloud.a TRAV AMP;EACUTE;S de un software programcci AMP;OACUTE;N(software)la informaci amp;OACUTE;N Ser AMP;AACUTE;processed and prepared for its later AN AMP;AACUTE;LISIS,se give AMP;AACUTE;access on online portal a trav amp;EACUTE;client may be;AACUTE;see informaci AMP;OACE; (n) Real time work of resources P
展开▼
机译:(b)建设阶段和建设项目的实时资源监测系统; ac N,在建设阶段和放大器; ac N,在操作阶段的后期; ac N,提供CI amp信息; ac N,按部门,级别和实时工作时间划分的工作时间; ac N,按部门,水平和实时工作时间划分的工时; ac N,提供CI放大器信息; ac N,按部门,级别和实时工作时间划分的工作时间; ac N,提供CI amp信息; OA;在那里,微芯片电子产品和放大器; ac Nico que apar amp;急性位置和放大器; ac用于在工作日的每个时刻监视资源。是,是,是1。将芯片与Tama放大器一起使用;小提琴O和重量,可以放置在保护和省队中; ac敏锐n功放急性对于属于控制营的工人; ac n。激光放大器小提琴在补给品中监控其位置; ac n;来自每个微芯片放大器;急性N,通过安装在特定部门和安培部门的接收天线接收;急性不雅建筑物,目标是覆盖项目部门的100%。记录的数据被发送到私有云。TRAVAMP; EACUTE;软件程序AMP; OACUTE; N(软件)信息放大器; OACUTE; N Ser AMP; AACUTE;为以后的AN AMP进行处理和准备; AACUTE; LISIS,这给AMP; AACUTE;在在线门户上访问的流量; EACUTE;客户端可能是; AACUTE;请参阅信息AMP; OACE;(n)资源的实时工作 P GT;
展开▼