首页> 外国专利> Bridge construction method, pillars and guide means used in the bridge construction method

Bridge construction method, pillars and guide means used in the bridge construction method

机译:桥梁施工方法,桥梁施工方法中使用的支柱和导向装置

摘要

PROBLEM TO BE SOLVED: To provide a method capable of minimally restricting a specification of a crane used in constructing a pier with a long-span structure or a long and large pile.SOLUTION: In an erection method to install a support pile 4 by making use of a beam structure 1 (pier panel) of a pier extending like a cantilever, a column body 3 that supports an intermediate part of the beam structure 1 extending like a cantilever is erected to tentatively support the beam structure 1. The erected column body 3 serves to tentatively support a construction machine used for erecting and removing of the pier and the beam structure 1. The column body 3 for intermediate support comprises, for example, a support pile inserted underground.SELECTED DRAWING: Figure 3D
机译:解决的问题:提供一种能够最小限度地限制在建造具有大跨度结构或长而大的桩墩的起重机时使用的起重机的方法。解决方案:在架设方法中,通过以下方法来安装支撑桩4使用像悬臂那样延伸的墩的梁结构1(码头面板),竖立支撑梁结构1的像悬臂那样延伸的中间部分的柱体3,以暂时支撑梁结构1。图3D用于临时支撑用于竖立和拆除墩台和梁结构1的建筑机械。用于中间支撑的柱体3包括例如插入地下的支撑桩。

著录项

  • 公开/公告号JP6681148B2

    专利类型

  • 公开/公告日2020-04-15

    原文格式PDF

  • 申请/专利权人 株式会社横山基礎工事;

    申请/专利号JP20150081287

  • 发明设计人 横山 弘介;

    申请日2015-04-10

  • 分类号E01D21;

  • 国家 JP

  • 入库时间 2022-08-21 11:33:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号