首页> 外国专利> Cogeneration of delayed coking plant

Cogeneration of delayed coking plant

机译:延迟焦化装置的热电联产

摘要

A system includes a heat exchange system and a power generation system. The heat exchange system includes first, second, and third heat exchangers each operable as a continuous source of heat from a delayed coking plant. The first and second heat exchangers heat first and second fluid streams to produce heated first and second fluid streams, respectively. The heated second fluid stream has a lower temperature and a greater quantity of heat than the heated first fluid stream. The third heat exchanger heats a third fluid stream to produce a heated third fluid stream that includes the heated first fluid stream and a hot fluid stream. The heated third fluid stream has a lower temperature than the heated first fluid stream. The power generation system generates power using heat from the heated second and third fluid streams.
机译:一种系统,包括热交换系统和发电系统。该热交换系统包括第一,第二和第三热交换器,每个第一热交换器,第二热交换器和第三热交换器可作为来自延迟的焦化厂的连续热源进行操作。第一和第二热交换器加热第一和第二流体流以分别产生加热的第一和第二流体流。与加热的第一流体流相比,加热的第二流体流具有较低的温度和更多的热量。第三热交换器加热第三流体流以产生加热的第三流体流,该第三流体流包括加热的第一流体流和热流体流。加热的第三流体流的温度低于加热的第一流体流的温度。发电系统利用来自加热的第二和第三流体流的热量来发电。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号