首页> 外国专利> Chimney demolition scaffold and chimney demolition method

Chimney demolition scaffold and chimney demolition method

机译:烟囱拆除脚手架及烟囱拆除方法

摘要

PROBLEM TO BE SOLVED: To provide a scaffold for chimney demolition, which enables inspection and the like to be simply performed during the chimney demolition, and a chimney demolition method.SOLUTION: A scaffold 1 for chimney demolition includes: a pair of masts 3 and 3 that are erected to face each other across a chimney 2; a work floor 4 that is circumferentially provided around the chimney 2; and a work floor 5 for inspection, which is arranged below the work floor 4. The work floor 4 is lifted/lowered by using the pair of masts 3 and 3 as guide rails. The work floor 5 for inspection is lifted/lowered independently of the work floor 4 by using mast 3 that is one of the pair of masts 3 and 3 as a guide rail.SELECTED DRAWING: Figure 1
机译:解决的问题:提供一种用于烟囱拆除的支架,该支架使得能够在烟囱拆除期间简单地进行检查等,以及烟囱拆除方法。解决方案:用于烟囱拆除的支架1包括:一对桅杆3和两个竖立在烟囱2上彼此面对的3个;围绕烟囱2周向设置的工作台4。另外,检查用的作业台5配置在作业台4的下方。作业台4通过将一对支柱3、3作为导轨而升降。通过使用作为一对导轨3和3中之一的桅杆3作为导轨,可以独立于工作地板4升高/降低用于检查的工作地板5。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号