A method of constructing a displaceable load model considering both environmental costs and rear-time electricity bill
A method of constructing a displaceable load model considering both environmental costs and rear-time electricity bill
展开▼
机译:同时考虑环境成本和滞后电费的可移动负荷模型的构建方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention transforms renewable energy into ecological costs that can be saved, combines the current rear-time electricity bill to obtain a new electricity bill model, obtains an optimized target load model, and a new displaceable load. Process large linear constrained integer quadratic programming models quickly and efficiently by building a model and solving a displaceable load model using the linear interactive general-purpose optimizer, the LINGO solver A method of constructing a displaceable load model that considers both the environmental cost and the rear-time electricity bill, which is faster and more efficient than conventional optimization algorithms such as the active set method, interior point method, and particle swarm algorithm I will provide a. By incorporating the model in the multi-target optimization scheduling of the microgrid, the grid power supply pressure at peak load is more effectively reduced, the peak power used by electric equipment is reduced, and the utilization rate of renewable energy is improved. Finally, the operational reliability and economic efficiency of the entire system can be improved. [Selection diagram] Figure 1
展开▼