首页>
外国专利>
REVETMENT FOUNDATION CONSTRUCTION METHOD
REVETMENT FOUNDATION CONSTRUCTION METHOD
展开▼
机译:地基基础施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a revetment foundation construction method, which can robustly install a revetment such that the revetment can be easily constructed and cannot be structurally moved when the revetment is constructed along a boundary between a slope and the bottom. To solve the purpose, the revetment foundation construction method according to the present invention comprises the steps of: an excavating step of excavating the bottom to a predetermined depth along the boundary between the slope and the bottom to form an excavated portion; a gabion connecting step of connecting and fixing a predetermined number of gabions by connecting rebars to meet the length of the excavated portion; a gabion installing step of transporting the gabions, connected by the connecting rebars, to the excavated portion and installing the gabions; and a burying step of filling, with stones, spaces between both sides of the excavated portion and the gabions to reclaim the space.;COPYRIGHT KIPO 2019
展开▼