首页> 外国专利> Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors rivers dams and concrete that can prevent the inflow of soil and water

Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors rivers dams and concrete that can prevent the inflow of soil and water

机译:使用多壁施工支撑锉的多壁施工方法以及用于防止水土流失的港口河流水坝和混凝土施工的支撑文件

摘要

The present invention relates to a method for constructing a port, a river, a dam, and a concrete building for constructing a port, a river, a dam, and a concrete building to prevent the infiltration of soil and water, The present invention relates to a wall construction method and a building structure using the multiwalled structure, wherein a groove 20 for inserting an inner plate into which the inner plate 11 of the support pile 10 is inserted is perforated (S100) for inserting an inner plate for inserting the outer plate (12) of the support pile (10) into a construction site (S200) of drilling a hole for inserting an outer plate, which is perforated around the outer circumferential plate insertion groove (20) at a predetermined interval, When the drilling operation of the inner circumference plate insertion groove 20 and the outer plate insertion groove 30 is completed, the inner plate 11 of the support pile is positioned in the inner plate insertion groove 20 Forming mold 40 in which the outer plate 12 of the support file 10 on the other side is positioned in the groove 30 for inserting the outer plate and then the support file is fixed to form the mold 40 A waterproof sheet insertion step (S400) for inserting a waterproof sheet (50) capable of ensuring watertightness into the mold (40) formed by the support pile (10) A three-dimensional reinforcing structure (70) having the same or similar size as the standard of the formwork (40) is inserted and fixed so as to ensure the rigidity of any one selected from concrete or grout placed in the formwork Reinforcing bar A filler filling step (S600) for filling and filling any one filler (60) selected from concrete or grout after the water fixing step (S500) and fixing the three-dimensional reinforcing structure (70) (S700) for curing for a certain period of time after the filling of the supporting wall (80) and the supporting file (10) fixed to the outer surface of the multiwalled body (80) (S800) for performing a surrounding process for the subsequent process after the process of drawing the substrate 10 is completed.
机译:用于建造港口,河流,水坝和混凝土建筑物的方法技术领域本发明涉及一种用于建造港口,河流,水坝和混凝土建筑物的方法,用于防止水和土壤的渗透。壁施工方法和使用该多层结构的建筑结构,其中,插入用于插入支撑板10的内板11的内板的槽20被穿孔(S100),用于插入用于插入外板的内板。将支撑桩(10)的板(12)钻入在建筑工地(S200)中钻出用于插入外板的孔,该孔以预定的间隔绕着外周板插入槽(20)穿孔。在完成内周板插入槽20和外板插入槽30中的一个的步骤之后,将支撑桩的内板11定位在内板插入槽20中,并在其中形成模具40。将支撑文件10的另一侧的外板12定位在用于插入外板的凹槽30中,然后将支撑文件固定以形成模具40。防水片插入步骤(S400),用于插入防水片。 (50)能够确保由支撑桩(10)形成的模具(40)中的水密性与尺寸(40)的模板相同或相似的三维加强结构(70)被插入并固定,从而为了确保放置在模板中的混凝土或水泥浆中的任何一种的刚性,钢筋在水固定步骤(S500)之后填充和填充选自混凝土或水泥浆中的任何一种填料(60)的填料填充步骤(S600),以及在填充支撑壁(80)和固定到多壁体(80)的外表面的支撑锉(10)之后,固定三维加固结构(S700)以固化一定的时间。 (S800)进行冲浪在拉出基板10的过程完成之后的后续过程的划痕过程。

著录项

  • 公开/公告号KR101975297B1

    专利类型

  • 公开/公告日2019-05-07

    原文格式PDF

  • 申请/专利权人 유지씨 주식회사;

    申请/专利号KR20180093085

  • 发明设计人 이성원;

    申请日2018-08-09

  • 分类号E02D17/04;E02D17/08;E02D31/02;

  • 国家 KR

  • 入库时间 2022-08-21 11:48:41

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号