首页>
外国专利>
Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors rivers dams and concrete that can prevent the inflow of soil and water
Multi-wall construction method using multi-wall construction supporting files and supporting files used for construction of harbors rivers dams and concrete that can prevent the inflow of soil and water
展开▼
机译:使用多壁施工支撑锉的多壁施工方法以及用于防止水土流失的港口河流水坝和混凝土施工的支撑文件
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a method for constructing a port, a river, a dam, and a concrete building for constructing a port, a river, a dam, and a concrete building to prevent the infiltration of soil and water, The present invention relates to a wall construction method and a building structure using the multiwalled structure, wherein a groove 20 for inserting an inner plate into which the inner plate 11 of the support pile 10 is inserted is perforated (S100) for inserting an inner plate for inserting the outer plate (12) of the support pile (10) into a construction site (S200) of drilling a hole for inserting an outer plate, which is perforated around the outer circumferential plate insertion groove (20) at a predetermined interval, When the drilling operation of the inner circumference plate insertion groove 20 and the outer plate insertion groove 30 is completed, the inner plate 11 of the support pile is positioned in the inner plate insertion groove 20 Forming mold 40 in which the outer plate 12 of the support file 10 on the other side is positioned in the groove 30 for inserting the outer plate and then the support file is fixed to form the mold 40 A waterproof sheet insertion step (S400) for inserting a waterproof sheet (50) capable of ensuring watertightness into the mold (40) formed by the support pile (10) A three-dimensional reinforcing structure (70) having the same or similar size as the standard of the formwork (40) is inserted and fixed so as to ensure the rigidity of any one selected from concrete or grout placed in the formwork Reinforcing bar A filler filling step (S600) for filling and filling any one filler (60) selected from concrete or grout after the water fixing step (S500) and fixing the three-dimensional reinforcing structure (70) (S700) for curing for a certain period of time after the filling of the supporting wall (80) and the supporting file (10) fixed to the outer surface of the multiwalled body (80) (S800) for performing a surrounding process for the subsequent process after the process of drawing the substrate 10 is completed.
展开▼