首页> 外国专利> METHOD FOR INTAKE CONSTRUCTION IN MOUNTAIN RIVER

METHOD FOR INTAKE CONSTRUCTION IN MOUNTAIN RIVER

机译:山区河道施工方法

摘要

A method provides preliminary preparation of intake chamber, water chamber, outgoing pipes, and their connection with stainless, lightweight, e.g. plastic pipes; and their delivery to the place for mounting, in non-assembled form; assembled construction placement in the river so, that water receiving pipes be disposed in parallel to water stream, and draining pipes – broadside. Outgoing pipe connection place with draining pipe should be disposed in suitable place, in construction bed and fixed by means of stones and/or feather, with its natural scolding, after water level rising.
机译:一种方法提供了进水室,水室,出水管的初步准备,以及它们与不锈钢轻质材料(例如,不锈钢)的连接。塑料管;并以非组装形式将其交付到安装地点;在河中进行组装施工,使集水管与水流平行放置,排水管–宽边。水位上升后,应将排水管与排水管的连接处放置在合适的位置,施工床中,并用石头和/或羽毛固定,并自然地责骂。

著录项

  • 公开/公告号GEU20192006Y

    专利类型

  • 公开/公告日2019-04-10

    原文格式PDF

  • 申请/专利权人 KATAMADZE TEIMURAZ;

    申请/专利号GE2016AU14299U

  • 发明设计人 KATAMADZE TEIMURAZ;

    申请日2016-10-12

  • 分类号E02B9/04;E03B3;

  • 国家 GE

  • 入库时间 2022-08-21 12:02:23

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号