首页>
外国专利>
MULTI-PERIOD AND DYNAMIC LONG TERM PLANNING OPTIMIZATION MODEL FOR A NETWORK OF GAS OIL SEPARATION PLANTS (GOSPS)
MULTI-PERIOD AND DYNAMIC LONG TERM PLANNING OPTIMIZATION MODEL FOR A NETWORK OF GAS OIL SEPARATION PLANTS (GOSPS)
展开▼
机译:油气分离厂网络的多周期动态长期规划优化模型
展开▼
页面导航
摘要
著录项
相似文献
摘要
A mass balance is determined for periodic final inlet component flow rates entering Gas Oil Separation Plants (GOSPs). For transfers between GOSPs, constraints are calculated based on capacities of pipelines and a single direction of transfer. Calculated final inlet component flow rates are maintained for each GOSP within the calculated maximum and minimum GOSP pipeline capacities. Raw materials and intermediate and final states are formulated. Consumed power is calculated in in linear form using known flow rates per equipment. Investment decisions are performed with respect to swing pipelines and new equipment and a final net present value (NPV) is calculated with an overall objective function.
展开▼