首页>
外国专利>
METHOD AND SYSTEM FOR COLLABORATIVE SCHEDULING OF PRODUCTION AND TRANSPORTATION BASED ON SHUFFLED FROG LEAPING AND PATH RELINKING ALGORITHMS
METHOD AND SYSTEM FOR COLLABORATIVE SCHEDULING OF PRODUCTION AND TRANSPORTATION BASED ON SHUFFLED FROG LEAPING AND PATH RELINKING ALGORITHMS
展开▼
机译:基于置换雾化和路径重新关联算法的生产与运输协同调度方法和系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method and system for collaborative scheduling of production and transportation based on shuffled frog leaping and path relinking algorithms. The method includes the following steps: 1. setting algorithm parameters; 2. generating an initial population; 3. calculating fitness values; 4. grouping the population; 5. performing local search on all groups and updating individuals in groups; 6. performing global search on all groups and updating individuals in groups; 7. gathering all groups to obtain a new population; 8. performing a greedy path relinking algorithm on elegant solutions in the population to obtain an updated population; and, 9. determining termination conditions of algorithms; if so, ending; or otherwise, returning to the step 3.
展开▼