首页>
外国专利>
A SELF-PROPELLED OFFSHORE WIND FARM INSTALLATION VESSEL, AND METHOD OF INSTALLATION USED IN THE CONSTRUCTION OF AN OFFSHORE WIND TURBINE FARM
A SELF-PROPELLED OFFSHORE WIND FARM INSTALLATION VESSEL, AND METHOD OF INSTALLATION USED IN THE CONSTRUCTION OF AN OFFSHORE WIND TURBINE FARM
展开▼
机译:自走式海上风电场安装容器及在海上风电场建设中的安装方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A wind farm installation vessel (1) at open see at the area of the off-shore installation site is ballasted to a first draught, at which the cargo main deck (5) is submerged below sea level, and at least two jack-up legs (2) on the wind farm installation vessel are brought into contact with the sea bottom (10), and a barge (11) with parts for construction of the wind farm is received at a cargo main deck of the vessel, following which the vessel (1) is positioned at a particular site of installation and is jacked-up by at least four jack-up legs (2) on the vessel, and a main crane or other lifting equipment on the vessel lifts a part from the barge (11) on the main cargo deck to the wind turbine construction erected from the sea bottom.
展开▼