首页>
外国专利>
METHOD AND DEVICE OF EVALUATING EFFICIENCY OF LONG-TERM PLANNING STRATEGY FOR MEASURES TO ENSURE REQUIRED STATUS OF COMPLEX ORGANIZATIONAL-TECHNICAL SYSTEM
METHOD AND DEVICE OF EVALUATING EFFICIENCY OF LONG-TERM PLANNING STRATEGY FOR MEASURES TO ENSURE REQUIRED STATUS OF COMPLEX ORGANIZATIONAL-TECHNICAL SYSTEM
展开▼
机译:评估复杂组织技术系统所需状态的长期规划策略效率的方法和装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
FIELD: computer equipment.;SUBSTANCE: invention relates to the field of automated systems for planning and managing the development of complex organizational and technical systems. Device for evaluating the effectiveness of the strategy contains: group of sensors of parameters of a complex organizational and technical system (COTS), a group of information parameter converters, a unit for modeling the dynamics of changes in the quantitative and qualitative state of the COTS, a block for modeling the application processes for the purpose of the COTS, a group of counters of parameters of the model of processes of change in the quantitative and qualitative state of COTS, a group of counters of parameters of the model of application processes for the purpose of COTS, a group of converters of parameters of COTS model information, block for the formation of predicted indicators of the status of COTS, the block of formation of the predicted cost indicators for the implementation of the long-term planning strategy of measures to ensure the required condition of the COTS, the block of the formation of the predicted performance indicators of the application for the purpose of the COTS, the block of the model information storage, a switching unit, a generating unit of a generalized indicator for evaluating the effectiveness of a long-term planning strategy for ensuring the required status of COTS, a data entry unit, a database storage unit, a device operation control unit.;EFFECT: technical result of the invention is to provide an automated calculation of the predicted values of the generalized indicator of the effectiveness of a long-term planning strategy for measures to ensure the required status of the COTS.;2 cl, 1 dwg
展开▼