RINGS CONSTRUCTION SCHEME OF UNDERGROUND WORKINGS GROUP OF RADIATION PART OF UNDERGROUND NUCLEAR POWER PLANT

机译:地下核电站辐射部分地下工作组的环施工方案

摘要

FIELD: construction.;SUBSTANCE: ring scheme for construction of production group for radiation part of subterranean nuclear power plant, containing (1) power plants for nuclear reactor, generating (2) power plants for electrical equipment, generating (3) power stations for safety, generating (6) power plants for atomic auxiliary facility, production (4) power plants for nuclear fuel, connection workings (5) power plants. First main transport tunnel (8), the second main transport tunnel (9), the third main transport tunnel (10), the fourth main transport tunnel (7) and the main steam channel (11); generation (1) power plant for nuclear reactor, production (2) power plants for electrical equipment, generation (3) power stations for safety, production (6) of electrical installation for atomic auxiliary installation, production (4) power plants for nuclear fuel and interconnections (5) power plants form group of underground workings for installations of radiation part of nuclear power plant; theel of upper arch or end wall of upper arch of each generation in group of underground workings for installations of radiation part of clear power plant is communicated with earth's surface through upper level of branching tunnels system; and lower parts of side walls of each generation in group of underground workings for nstallations of radiation part of nuclear power plant are connected to each main transport tunnel and main steam channel through lower level of branching tunnels system.;EFFECT: group of underground workings of construction scheme described above has short distances, satisfactory safety and high degree of modularity, is convenient for construction and saves investments.;6 cl, 3 dwg
机译:领域:施工;实体:地下核电站辐射部分生产组的建造的环形方案,其中包括(1)核反应堆电站,发电(2)电气设备电站,发电(3)电站安全,发电(6)原子辅助设施发电厂,生产(4)核燃料发电厂,连接装置(5)发电厂。第一主输送通道(8),第二主输送通道(9),第三主输送通道(10),第四主输送通道(7)和主蒸汽通道(11);一代(1)核反应堆电厂,生产(2)电气设备电厂,一代(3)安全电站,生产(6)原子辅助安装电气装置,生产(4)核燃料电厂(5)电厂是地下工作组,用于安装核电站的辐射部分;地下电站群中,用于发电站辐射部分安装的各代上拱或上拱的端壁通过分支隧道系统的上层与地面连通。核电站辐射部分安装地下工作组中各代侧壁的下部和下部分支支管系统分别连接至每个主运输隧道和主蒸汽通道。上述施工方案距离短,安全性好,模块化程度高,施工方便,节省投资。; 6 cl,3 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号