PC Construction technique of concrete structures through the Precast Concrete

机译:预制混凝土混凝土结构PC施工技术

摘要

this invention is a pc through the concrete building construction method in construction, the structure of the skeleton is equivalent to that of steel, and steel and connected to the connection part is installed on the concrete after curing, to form the floor, floor the upper part of the connection part is fixed on the connecting rod of the vertical projection is formed in the formation stage (S10); andin the majority of the groove is formed in the upper part of a granulating machine in a laminate, the connection of the assembly to connect the connecting rod is inserted in the round, the assembly can be fixed in the assembly and the connection of the ub465uc758 and yan it is injected into the formation through the injection of mortar in the maintenance of the assembly is firmly fixed to a post stage of the (S20); andthe upper part of the assembly to be laminated in a stop at the end of a line, and formed in the assembly is a combination of the above vertical projection is to be connected is reinforced in the end, the group formed in different combination and the assembly of the... in the post is connected to the end of the bar is not a great step in the assembly is placed in a fixed layout must be at level (S30); andit's a little on the part of the laminate is placed in the small, the first is the biggest of the center side are formed on the fixed groove is fixed in the other end, and the other side is the side of the center of the fixing groove formed on the it is fixed. as far as the layout of the small (S40); and, in the slavic to the big and small of the laminate is placed in the assembly of the slavic stage (S50); andthe assembly of the concrete with the cyrillic, the slavic "curing" the formation of the slavic formation stage (S60); a characteristic is, as in the...the external production (cultivation) of the assembly to a large, small, and the construction site of the slavic is transferred by a granulator, in between the big to small, the cyrillic and the assembly is laminated in order to save construction method is very convenient and the columns and at the slit. the construction can do it, youin the beam and to the slavic and the construction of the project, for a variety of building construction, and greatly reduce the time it can save not only to me, has been due to the process of human's needs, can reduce the human and a building construction implementation can be effective.also, a large and small to the formation of the slavic and the reinforcing bar assembly formed in the reinforcing bar distribution through the function of the slavic is placed between a reinforcing bar can be fixed in a convenient and rapid construction of the slavic can be effective.
机译:本发明是一种通过混凝土建筑施工的pc的施工方法,其骨架的结构等效于钢结构,并且将与钢连接的连接部分固化后安装在混凝土上,形成地板,地板的上部在形成阶段中,将连接部的一部分固定在垂直突起的连杆上(S10)。并且在绝大部分的凹槽中形成在造粒机的上部的层压板中,将组件的连接件与连接杆的连接件插入成圆形,该组件可以固定在组件和组件的连接件上ub465 uc758和yan将其通过注入灰浆注入地层中,在将组件的维护中牢固地固定到后期(S20);并且该组件的上部被层压在一条线的末端的一个挡块中,并且在该组件中形成的是上述垂直突出部的组合,该垂直突出部被连接在端部被加强,该组以不同的组合形成并且组装...在柱子上连接到杆的末端不是很大的一步,在将组装以固定布局放置时必须处于水平(S30);并在层压板的一部分上将其放置在较小的部分中,第一个是最大的中心侧,形成在固定槽的另一端,另一侧是固定中心的那一侧在其上形成的凹槽是固定的。就小布局而言(S40);并且,从大到小将层压板放置在从属阶段的组件中(S50);以及用西里尔字母,斯拉夫字母“固化”的斯拉夫字母形成阶段的混凝土的组装(S60);一个特点是,就像...组件的外部生产(耕种)成大,小,而斯拉夫的工地通过制粒机转移,在大到小之间,将西里尔字母和组件层压在一起以节省建造方法方便,列和在缝。施工可以做到这一点,您在束腰,为奴隶而进行的工程建设中,用于各种建筑施工,并大大减少了它可以节省的时间不仅对我来说,一直是由于人类的需求过程,可以减少人员和建筑施工的实施效果。另外,无论是大尺寸还是小尺寸的从动件的形成,以及通过在从动件的分配而形成于加强件分配中的加强件组件被固定在加强件之间,可以方便,快捷地构造从动件。 。

著录项

  • 公开/公告号KR101866559B1

    专利类型

  • 公开/公告日2018-06-12

    原文格式PDF

  • 申请/专利权人 황성섭;

    申请/专利号KR20150141262

  • 发明设计人 황성섭;

    申请日2015-10-08

  • 分类号E04B1/00;E04B1/38;E04B1/90;E04B5/02;E04B5/32;E04C3/02;E04C3/30;E04C5/01;

  • 国家 KR

  • 入库时间 2022-08-21 12:37:41

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号