REPLACEMENT METHOD FOR MAIN CABLE OF SUSPENSION BRIDGE

机译:悬索桥主缆的更换方法

摘要

PROBLEM TO BE SOLVED: To provide a replacement method for a main cable of a suspension bridge in which a main cable of a suspension bridge is replaced without installing a temporary cable along the main cable prior to removing the main cable and eliminating complicated processes to an extent possible.;SOLUTION: A diagonal suspension cable 11 is spanned between a main tower 2 and a stiffening girder 5 of a suspension bridge 1, for holding the stiffening girder 5. A hanger rope 4 is dismantled and removed under the condition, and a main cable 3 is replaced. The new hanger rope 4 is hung from the newly installed main cable 3, and the main cable 3 is made to hold the stiffening girder 5 while the hanger rope 4 supports the stiffening girder 5. Then, the diagonal suspension cable 11 is removed. A diagonal suspension steel tower 13 is installed outside of the main tower 2 when necessary, for having the diagonal suspension cable 11 spanned between the diagonal suspension steel tower 13 and the stiffening girder 5 and holding the stiffening girder 5.;SELECTED DRAWING: Figure 3;COPYRIGHT: (C)2018,JPO&INPIT
机译:要解决的问题:提供一种用于吊桥主电缆的更换方法,其中在不拆卸主电缆之前沿主电缆安装临时电缆的情况下更换吊桥的主电缆,并且消除了对吊桥的复杂处理解决方案:对角悬挂电缆11跨在主塔2和悬索桥1的加劲梁5之间,用于固定加劲梁5。在这种情况下,将吊索4拆除和拆除,主电缆3已更换。从新安装的主缆线3上悬挂新的吊索4,并且在吊索4支撑加劲梁5的同时使主索3保持加劲梁5。然后,去除对角悬索11。对角悬挂钢塔13在必要时安装在主塔2的外部,以使对角悬挂电缆11跨在对角悬挂钢塔13和加劲梁5之间,并固定加劲梁5。选图:图3 ;版权:(C)2018,JPO&INPIT

著录项

  • 公开/公告号JP2018003526A

    专利类型

  • 公开/公告日2018-01-11

    原文格式PDF

  • 申请/专利号JP20160134700

  • 发明设计人 TOMARI RYOICHI;

    申请日2016-07-07

  • 分类号E01D22;E01D11/02;E01D19/16;E01D21;

  • 国家 JP

  • 入库时间 2022-08-21 13:14:04

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号