首页> 外国专利> DEVICE FOR SETTING TARGET MOLTEN STEEL TEMPERATURE AT CONVERTER BLOWING COMPLETION, METHOD FOR SETTING TARGET MOLTEN STEEL TEMPERATURE AT CONVERTER BLOWING COMPLETION, CONVERTER BLOWING METHOD AND CONVERTER OPERATION METHOD

DEVICE FOR SETTING TARGET MOLTEN STEEL TEMPERATURE AT CONVERTER BLOWING COMPLETION, METHOD FOR SETTING TARGET MOLTEN STEEL TEMPERATURE AT CONVERTER BLOWING COMPLETION, CONVERTER BLOWING METHOD AND CONVERTER OPERATION METHOD

机译:转炉吹炼完成时目标钢水温度的设定方法,转炉吹炼完成时目标钢水温度的设定方法,转炉吹气方法及变频器的操作方法

摘要

PROBLEM TO BE SOLVED: To provide a technology capable of setting a target molten steel temperature at converter blowing completion at high accuracy.;SOLUTION: There is provided a device for setting target molten steel temperature at converter blowing completion having a part 11 of setting molten steel temperature at casting initiation for setting a molten temperature at casting initiation, a tundish temperature distribution state calculation part 10 for estimating temperature distribution state in a thickness direction of a refractory layer of tundish 5, a part 13 of estimating a molten steel temperature in tundish for estimating molten steel temperature using the temperature distribution state or the like, a part 9 for setting molten steel temperature needed at casting initiation for setting molten steel temperature at arrive time of continuous casting facility when molten steel temperature difference between the molten steel temperature in the tundish and needed molten steel temperature in the tundish is in molten steel temperature difference allowable range, and a part 8 for setting target molten steel temperature at converter blowing completion for setting target molten steel temperature at converter blowing completion based on the molten steel temperature needed at casting initiation.;SELECTED DRAWING: Figure 2;COPYRIGHT: (C)2018,JPO&INPIT
机译:解决的问题:提供一种能够高精度地设定转炉吹炼完成时的目标钢水温度的技术。解决方案:提供一种用于设定转炉吹炼完成时的目标钢水温度的装置,该装置具有设定钢水的部分11。用于设定浇铸开始时的熔融温度的浇铸开始时的钢温度,用于估计中间包5的耐火层的厚度方向上的温度分布状态的中间包温度分布状态计算部10,用于估计中间包中的钢水温度的部分13。为了使用温度分布状态等来估计钢水温度,部件9用于设定铸造开始时所需的钢水温度,该钢水温度用于设定在连铸设备到达时的连铸设备到达时的钢水温度。中间包和所需的钢水温度中间包中的钢水在钢水温度差允许范围内,并且部分8用于设定转炉吹炼完成时的目标钢水温度,用于基于铸造开始时所需的钢水温度来设定转炉吹炼完成时的目标钢水温度。图纸:图2;版权:(C)2018,JPO&INPIT

著录项

  • 公开/公告号JP2018003079A

    专利类型

  • 公开/公告日2018-01-11

    原文格式PDF

  • 申请/专利权人 JFE STEEL CORP;

    申请/专利号JP20160129793

  • 发明设计人 TAKAGI HIROMASA;

    申请日2016-06-30

  • 分类号C21C5/30;B22D11/16;B22D11/10;B22D11/18;

  • 国家 JP

  • 入库时间 2022-08-21 13:14:06

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号