首页> 外国专利> System for the current fee schedule control and power supply for a building, a process for the current fee schedule control for a building and method for accounting for the power supply of a building

System for the current fee schedule control and power supply for a building, a process for the current fee schedule control for a building and method for accounting for the power supply of a building

机译:用于建筑物的当前费用进度表控制和电源的系统,用于建筑物的当前费用进度表控制的过程以及用于核算建筑物的电源的方法

摘要

A system for the current fee schedule control of a building comprises a current connection with a current meter, which is arranged to detect and at least two. In this case, a first, the amount of current from the building is picked up from the mains power supply of electricity and a second amount of current from the building to the power supply of the delivered current. In addition, the current fee schedule control, a connection for a current source with a measuring device, the currently generated current can be measured, at least two more fee counter that are adapted to detect a plurality of and, and a control device. This is by means of data link to the measuring device of the current source, with the electricity meter of the connection to an external electricity network system and with the more fee counters and connected, the currently from the external power supply current which is related to detect the current generated by the current source to detect and with the aid of these values, in which tariff to switch the more fee counter, and this information to be passed to the more fee counter. A corresponding method for the current fee schedule control is also given.A power supply for a building comprises a current fee schedule control and at least one current source.In a billing method, a division of the and on the tariffs of the more fee counter carried out, in which the fee for the generated current is lower than the price for the current, which is drawn from the external electric power supply system.
机译:用于建筑物的当前费用时间表控制的系统包括与电流计的电流连接,该电流计被布置为检测至少两个。在这种情况下,第一,来自建筑物的电流量是从市电供电中获取的,第二是从建筑物到输送电流的电源中的电流量。另外,当前费用计划控制,用于电流源与测量装置的连接,当前产生的电流可以被测量,至少两个另外的适于检测多个和的费用计数器以及控制装置。这是通过数据链接到电流源的测量设备,通过电表连接到外部电网系统,并且通过连接更多的费用计数器,当前来自外部电源的电流与检测由电流源产生的电流以检测并借助这些值,在其中用电费来切换更多费用计数器,并将此信息传递给更多费用计数器。还提供了一种用于当前费用表控制的相应方法。建筑物的电源包括当前费用表控制和至少一个电流源。在计费方法中,将more费用计数器的价目表和分开。进行,其中产生的电流的费用低于从外部电源系统提取的电流的价格。

著录项

  • 公开/公告号DE102015108764A1

    专利类型

  • 公开/公告日2016-12-08

    原文格式PDF

  • 申请/专利权人 SOLARWORLD INNOVATIONS GMBH;

    申请/专利号DE201510108764

  • 发明设计人 MARTIN KUTZER;SVEN WENDT;

    申请日2015-06-03

  • 分类号G06Q50/06;H02J13;G01R22;

  • 国家 DE

  • 入库时间 2022-08-21 13:22:53

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号