首页> 外国专利> DOMESTIC ENERGY GENERATION INSTALLATION AND OPERATING METHOD FOR OPERATING A DOMESTIC ENERGY GENERATION INSTALLATION

DOMESTIC ENERGY GENERATION INSTALLATION AND OPERATING METHOD FOR OPERATING A DOMESTIC ENERGY GENERATION INSTALLATION

机译:进行本能发电安装的本能发电安装及操作方法

摘要

The invention relates to a method for operating a domestic energy generation installation, which method comprises the following steps: (S1) ascertaining or prespecifying at least one expectation time period, (S2) ascertaining an expected load profile of an electrical consumer (610), (S3) ascertaining an expected yield profile of the regenerative energy source in the at least one expectation time period, (S4) ascertaining or prespecifying a minimum consumption power (V_VB) which should at least be available for withdrawal from the storage battery unit (440) at any one time, (S5) ascertaining an energy balance over at least one expectation time period from the expected yield profile and the expected load profile, (S6) ascertaining a time range of the storage battery unit (440) from the expected load profile, the expected yield profile and the minimum consumption power, which should not be undershot at any time, and from a currently ascertained state of charge of the storage battery unit (440), (S7) operating the fuel cell unit (200) depending on the ascertained time range of the storage battery unit (440), and (S8) operating the electrolysis unit (300) depending on the ascertained energy balance.
机译:本发明涉及一种用于操作家用能量产生设备的方法,该方法包括以下步骤:(S1)确定或预先规定至少一个期望时间段,(S2)确定用电器的期望负载曲线(610), (S3)确定在至少一个预期时间段内的再生能源的预期产量曲线,(S4)确定或预定至少应可用于从蓄电池单元中取出的最小消耗功率(V_VB) )在任何时候,(S5)从预期产量曲线和预期负载曲线确定至少一个预期时间段内的能量平衡,(S6)从预期负载确定蓄电池单元(440)的时间范围曲线,预期的收益曲线和最小消耗功率(不应从当前确定的蓄电池充电状态中随时降低) (440),(S7)根据所确定的蓄电池单元(440)的时间范围来操作燃料电池单元(200),以及(S8)根据所确定的能量平衡来操作电解单元(300)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号