首页> 外国专利> Large section covering body and method of constructing large section tunnel

Large section covering body and method of constructing large section tunnel

机译:大断面覆盖体及大断面隧道的施工方法

摘要

An object of the present invention is to provide a large cross-section lining body and how to build a large cross-section tunnel that is capable of widening the existing tunnel.From A lamp tunnel 1 and step to build a radial space towards a substantially perpendicular direction of the tunnel axis, reaching in the radial direction space from the side wall of the radial space allowed to start the tunnel boring machine in after being boring in an annular drilling and process, and the process to build a cylindrical shell part 3 surrounding the lamp tunnel 1 by making continuous a plurality of annular tunnel 31A-31C, a cylindrical shell portion 3 inside the ground to build a ring-shaped tunnel 31A to and, it opened a process to build a gable wall portion 4 so as to close the both ends of the cylindrical shell section 3, the interval between the preceding tunnel of multiple book toward the outside of the gable wall section 4 from the inside of the gable wall portion 4 preceding tunnel and the construction process, and the line tunnel construction process after building the trailing tunnel during the preceding tunnel adjacent to each other, leading tunnel and drilled a region surrounded by the trailing tunnel form a large cross-section to be juxtaposed And a drilling step of.(FIG.
机译:发明内容本发明的目的是提供一种大横截面衬砌体,以及如何构建能够使现有的隧道变宽的大横截面隧道。从灯隧道1开始,逐步向大体上形成径向空间。沿垂直于隧道轴线的方向,从径向空间的侧壁到达径向空间,允许在进行环形钻孔后钻入隧道掘进机并进行钻削加工,以及围绕圆柱壳部分3的加工过程通过使多个环形隧道31A-31C,地面内部的圆筒形壳体部分3连续地在灯隧道1中构建环形隧道31A,并且打开了封闭山墙壁部分4的过程。在圆筒形外壳部分3的两端,多层书本的在前隧道从山墙壁部分4的内部朝向山墙壁部分4的外部与前隧道之间的间隔在施工过程中,与线形隧道的施工过程是在将尾随隧道建成后,在前隧道彼此相邻的情况下,引出隧道和被尾随隧道所包围的区域形成一个大的横截面,并将其并置和一个钻孔步骤。 (图。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号