首页> 外国专利> How to Update the removal method and the existing bridge of the existing bridge

How to Update the removal method and the existing bridge of the existing bridge

机译:如何更新现有桥的移除方法和现有桥

摘要

PROBLEM TO BE SOLVED: To provide a removal technique of an existent bridge for removing the bridge in a short time and while minimizing influences exerted upon the surroundings.SOLUTION: On an existent bridge girder 1 provided for overhead crossing of an overpass 71 to a vehicle traveling road or the like 72, an erection beam 2 such as an erection girder is fed out and disposed by utilizing a space of the overpass 71. The existent bridge girder 1 is supported by the erection beam 2 through a temporary suspension beam 6 and a suspension steel bar 5 disposed in an axial direction of the existent bridge girder 1 in a predetermined pitch. The existent bridge girder 1 is cut into a plurality of girder blocks 1b so as to include a pair of neighboring temporary suspension beams 6 (suspension steel bars 5). A lower suspension metal fitting 13 is fitted to a pair of temporary suspension beams 6 of the girder block 1b and individually lifted by a movable lift device 3, the connection of the suspension steel bars 5 at the side of the erection beam 2 is canceled, loaded onto a vehicle waiting on the overpass 71 or the vehicle traveling road or the like 72 and removed.
机译:解决的问题:提供一种现有桥梁的拆除技术,以在短时间内拆除该桥梁,同时最大程度地减少对周围环境的影响。解决方案:在现有的桥梁梁1上,该架桥1用于从天桥71架空越过车辆。在行进路等72上,利用立交桥71的空间将诸如架设梁的架设梁2送出并布置。通过架设梁2,通过临时悬挂梁6和吊架1支撑现有的桥梁梁1。悬臂钢筋5以规定的间距在现有的桥梁1的轴向上配置。将现有的桥梁梁1切成多个梁块1b,以包括一对相邻的临时悬挂梁6(悬挂钢筋5)。下悬架金属配件13装配到梁架1b的一对临时悬架梁6上,并由可移动的提升装置3分别提起,取消了悬架钢筋5在架设梁2侧的连接,装载到等待在立交桥71或车辆行驶道路等上的车辆72上并被移除。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号