首页> 外国专利> EVALUATION METHOD FOR MANUFACTURING WORK IN MANUFACTURING METHOD OF ELECTRIC WIRE WITH TERMINAL, DEVICE FOR CRIMPING ELECTRIC WIRE WITH TERMINAL, EVALUATION DEVICE, AND MANUFACTURING WORK EVALUATION SYSTEM

EVALUATION METHOD FOR MANUFACTURING WORK IN MANUFACTURING METHOD OF ELECTRIC WIRE WITH TERMINAL, DEVICE FOR CRIMPING ELECTRIC WIRE WITH TERMINAL, EVALUATION DEVICE, AND MANUFACTURING WORK EVALUATION SYSTEM

机译:带有端子的电线的制造方法中的制造作业的评价方法,带有端子的电线的压接装置,评价装置以及制造作品的评价系统

摘要

PROBLEM TO BE SOLVED: To provide a technology capable of more accurately calculating the time required for one time of manufacturing work in manufacturing work to be performed continuously.SOLUTION: An evaluation method for manufacturing work in a manufacturing method of an electric wire with terminal for continuously manufacturing a plurality of electric wires 90 with terminal by performing the manufacturing work multiple times, the electric wire with terminal being obtained by crimping a crimp terminal 8 in an end portion of an electric wire 9 by one time of manufacturing work, includes: a first step for acquiring work information based on a time of predetermined work timing in n-th manufacturing work in multiple times of manufacturing work and a time of predetermined work timing in m-th manufacturing work; and a second step of calculating a unit work time per electric wire with terminal by dividing a work time, that is obtained from the work information, from the predetermined timing in the n-th manufacturing work to the predetermined work timing in the m-th manufacturing work with the number of times of processing that is obtained by subtracting (n) from (m), wherein (n) and (m) are positive integers, (m) is greater than (n) and (n) is a numerical value equal to or greater than 2.SELECTED DRAWING: Figure 1
机译:解决的问题:提供一种能够在连续进行的制造工作中更准确地计算一次制造工作所需的时间的技术。解决方案:一种用于具有端子的电线的制造方法中的制造工作的评估方法。通过多次执行制造工作来连续制造多条带有端子的电线90,该带有端子的电线是通过一次制造工作将电线9的端部中的压接端子8压接而获得的,包括:第一步,基于多次制造工作中的第n个制造工作中的预定工作时间和第m次制造工作中的预定工作时间,获取工作信息;第二步骤是通过将从工作信息中获得的工作时间从第n个制造工作中的预定时间除以第m个工作中的预定工作时间来计算每条带端子的电线的单位工作时间通过从(m)中减去(n)获得的处理次数进行的制造工作,其中(n)和(m)是正整数,(m)大于(n),并且(n)是数值值等于或大于2.SELECTED DRAWING:图1

著录项

  • 公开/公告号JP2016213110A

    专利类型

  • 公开/公告日2016-12-15

    原文格式PDF

  • 申请/专利权人 SUMITOMO WIRING SYST LTD;

    申请/专利号JP20150097202

  • 发明设计人 SHIMOHARA SAKI;

    申请日2015-05-12

  • 分类号H01R43;G05B19/418;H01R43/048;H01B13;

  • 国家 JP

  • 入库时间 2022-08-21 13:59:40

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号