首页> 外国专利> METHOD AND SYSTEM FOR FORMULATING PLAN FOR SEWER CULVERT RENEWAL WORK

METHOD AND SYSTEM FOR FORMULATING PLAN FOR SEWER CULVERT RENEWAL WORK

机译:下弯管更新工程规划方案的方法和系统

摘要

PROBLEM TO BE SOLVED: To contribute to soundly manage sewer culvert renewal work by optimizing formulation of the sewer culvert renewal work of public sewerage of an autonomous body.;SOLUTION: A method of formulating a plan for sewer culvert renewal work includes: a first step of inputting pipe diameter information of culverts and construction extension information; a second step of calculating an open cut method total cost of the construction cost and an environmental cost of the open cut method on the basis of the pipe diameter information and the construction extension information and calculating the pipe renewal method total cost of the construction cost and environmental cost in the pipe renewal work; a third step of comparing the open cut method total cost with the pipe renewal work total cost; and a fourth step of outputting a comparison result by the third step.;SELECTED DRAWING: Figure 1;COPYRIGHT: (C)2017,JPO&INPIT
机译:要解决的问题:通过优化自治机构公共下水道的下水道涵洞更新工作的制定,为合理管理下水道涵洞更新工作做出贡献;解决方案:制定下水道涵洞更新计划的方法包括:第一步输入涵管直径信息和施工扩展信息;第二步,根据管径信息和施工延期信息,计算开挖法的总造价和开挖法的环境成本,并计算出换管法的总造价和管道更新工作中的环境成本;第三步,将明挖法总成本与管道更新工作总成本进行比较;第四步;输出第三步的比较结果。;选择的图纸:图1;版权:(C)2017,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号