首页> 外国专利> Task scheduling based on dependencies and resources

Task scheduling based on dependencies and resources

机译:基于依赖关系和资源的任务调度

摘要

An example system identifies a set of tasks as being designated for execution, and the set of tasks includes a first task and a second task. The example system accesses task dependency data that corresponds to the second task and indicates that the first task is to be executed prior to the second task. The example system, based on the task dependency data, generates a task dependency model of the set of tasks. The dependency model indicates that the first task is to be executed prior to the second task. The example system schedules an execution of the first task, which is scheduled to use a particular data processing resource. The scheduling is based on the dependency model.
机译:示例系统将一组任务标识为被指定用于执行,并且该组任务包括第一任务和第二任务。示例系统访问与第二任务相对应的任务依赖性数据,并指示第一任务将在第二任务之前执行。示例系统基于任务相关性数据,生成一组任务的任务相关性模型。依赖性模型指示第一个任务要在第二个任务之前执行。示例系统调度第一任务的执行,该第一任务被调度为使用特定的数据处理资源。调度基于依赖性模型。

著录项

  • 公开/公告号US9223628B2

    专利类型

  • 公开/公告日2015-12-29

    原文格式PDF

  • 申请/专利权人 EBAY INC.;

    申请/专利号US201414509936

  • 发明设计人 PERV RASTOGI;

    申请日2014-10-08

  • 分类号G06F9/46;G06F9/50;H04L29/08;G06F9/48;

  • 国家 US

  • 入库时间 2022-08-21 14:28:35

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号