MANAGING MULTIPLE TASKS OF A PROJECT PLAN VIA A TASK MANAGEMENT TOOL

机译:通过任务管理工具来管理项目计划的多个任务

摘要

Systems, methods, and other embodiments for providing management of tasks of a project plan associated with a computer application are described. In one embodiment, a task management tool is disclosed that is configured to generate a task rectangle for display in a task management view. The task rectangle is representative of a task of the project plan in a Cartesian plane format having two attribute axes. An attribute indicium is also generated for display at a first position within the task rectangle as determined by the intersection of two attribute values of the first task on each of the two attribute axes, respectively. At least one of the two attribute values may be modified by re-positioning the attribute indicium at a second position within the task rectangle. The two attribute values take on two attribute axes values of the Cartesian plane format that intersect at the second position.
机译:描述了用于提供对与计算机应用程序相关联的项目计划的任务的管理的系统,方法和其他实施例。在一个实施例中,公开了一种任务管理工具,其被配置为生成任务矩形以在任务管理视图中显示。任务矩形以具有两个属性轴的笛卡尔平面格式表示项目计划的任务。还生成属性标记以显示在任务矩形内的第一位置处,该属性标记分别由第一任务的两个属性值在两个属性轴上的交点确定。通过将属性标记重新放置在任务矩形内的第二位置,可以修改两个属性值中的至少一个。这两个属性值采用在第二个位置相交的笛卡尔平面格式的两个属性轴值。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号