Pile type offshore structure construction method and pile type offshore structure

机译:桩式海上结构施工方法及桩式海上结构

摘要

PROBLEM TO BE SOLVED: To obtain high work efficiency by shortening a construction term without adverse influences of waves even in the area of the sea of severe waves.;SOLUTION: For a piled marine structure 1, spuds are fitted into leg wells formed in four corners of a building frame 2, and a plurality of pile installation holes are formed between the spuds. A bottom part of the pile installation hole is sealed by a diaphragm. A construction method of the piled marine structure 1 includes the steps of: towing the building frame 2 including the leg wells into which the spuds 5 are fitted and the pile installation holes to a predetermined location on the sea and supporting the building frame 2 on the sea; moving down the spuds 5 with respect to the building frame 2 through a lifting jack 6 and installing the spuds on the seabed, thereby moving the building frame 2 up to a height position where the building frame is not affected by waves, higher than the sea level; increasing a weight of the building frame 2 by injecting ballast water into a container 16 within the building frame 2 in this location; and fixing piles 10 to the building frame 2 by installing the piles 10 to the seabed deeper than the spuds 5 through the pile installation holes provided in the building frame 2.;COPYRIGHT: (C)2014,JPO&INPIT
机译:解决的问题:为了缩短工期以获得高工作效率,即使在强浪海域,也不会受到浪潮的不利影响。;解决方案:对于堆积的海洋结构1,将钉子安装在四个腿形井中在建筑框架2的角部,在桩之间形成多个桩安装孔。桩安装孔的底部由隔膜密封。堆叠式海事建筑物1的建造方法包括以下步骤:将包括安装有桩钉5的腿部井的建筑框架2和桩安装孔拖曳到海上的预定位置,并将建筑框架2支撑在海上。海;通过升降千斤顶6相对于建筑框架2向下移动桩钉5并将桩钉安装在海床上,从而将建筑框架2移动到不受海浪影响的高度位置,该位置比海高。水平;通过将压载水注入该位置处的建筑框架2内的容器16中来增加建筑框架2的重量;通过将桩10穿过结构框架2中设置的桩安装孔,将桩10安装到比桩钉5更深的海底,将桩10固定在建筑物框架2上。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号