首页>
外国专利>
Control method of the port cargo handling equipment to reduce the loading time and port cargo handling equipment
Control method of the port cargo handling equipment to reduce the loading time and port cargo handling equipment
展开▼
机译:减少装货时间的港口货物装卸设备的控制方法及港口货物装卸设备
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a method of controlling equipment for cargo loading/unloading in a harbor and equipment for cargo loading/unloading in a harbor for shortening of cargo loading/unloading time without changing power consumption.;SOLUTION: A motor of a crane is controlled so that: a container may be hoisted up and down at a predetermined first rate of acceleration by a first maximum torque Tm, which is a maximum torque of an area A2 of constant torque, from the start of hoisting up and down of the container to a reference velocity V0 irrespective of the load of the container; a second torque, which is a difference between a second maximum torque Tv being the maximum torque inversely proportional to the velocity determined by an area A2 of constant output and a holding torque Tw, may be calculated at predetermined regular time intervals from the reference velocity V0 to a maximum velocity Vmax calculated from the load; and hoisting up and down may be performed at a second rate of acceleration, which is variable at predetermined regular time intervals, by the calculated second torque.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼