首页> 外国专利> How to build a mountain Tomekabe

How to build a mountain Tomekabe

机译:如何建造一座山的Tomekabe

摘要

PROBLEM TO BE SOLVED: To provide a construction method for an earth retaining wall, for enabling the reliable insertion of a core material even into a narrow position.SOLUTION: The construction method for the earth retaining wall comprises: a step S2 of driving a drilling device 10 to drill a ground; a step S3 of driving the drilling device 10 to construct a soil improvement body 22 while pulling out a rod 11; and a step S4 of preparing gas pipes 50 each having a smaller diameter than the rod 11 and connectable to one another via screw joints, and driving the drilling device 10 to insert the gas pipes 50 into the soil improvement body 22 while adding the gas pipes 50 to extend therefrom.
机译:解决的问题:提供一种挡土墙的施工方法,以使芯材即使在狭窄的位置也能可靠地插入。解决方案:挡土墙的施工方法包括:驱动钻孔的步骤S2装置10在地面上钻孔;步骤S3,在拔出杆11的同时驱动钻探装置10以构造土壤改良体22。步骤S4,准备直径比杆11小的直径且可通过螺纹接头相互连接的气管50,并驱动钻孔装置10将气管50插入土壤改良体22中,同时添加气管50从那里延伸。

著录项

  • 公开/公告号JP5885603B2

    专利类型

  • 公开/公告日2016-03-15

    原文格式PDF

  • 申请/专利权人 大成建設株式会社;

    申请/专利号JP20120151918

  • 发明设计人 林 和宏;

    申请日2012-07-05

  • 分类号E02D17/04;E02D29/045;E21D13/00;

  • 国家 JP

  • 入库时间 2022-08-21 14:42:00

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号