METHOD TO PREVENT DEFORMATIONS OF LINEAR STRUCTURES ERECTED ON LANDSLIDE SLOPES OR MANMADE SLOPES ON MELTING PERMAFROST SOILS

机译:防止多年冻土融化时滑坡或人工边坡上线性结构变形的方法

摘要

FIELD: construction.SUBSTANCE: method to prevent deformations of linear structures, erected on landslide slopes or manmade slopes on melting permafrost soils, includes erection of a working site, installation of piles into slope soil, combination of piles into a single grill. After submersion of piles into soil at the free end of each pile they install a reinforced concrete head, and combination of piles into a single grill is carried out by installation of a vertical geogrid, stiffly connected to heads of piles and layers of horizontal geogrids arranged above heads of piles. The working site from the bottom of the pile heads to the first layer of the horizontal geogrid and also gaps between layers of geogrids are filled with crushed stone and compacted. Horizontal geogrids are installed with the condition of their partial arrangement in a non-moving massif of the slope soil or natural slope.EFFECT: prevention of deformations of motor and rail roads on slopes under conditions of melting permafrost soils in process of operation of structures, reduced material intensity, realisation of anti-landslide actions.2 dwg
机译:领域:建筑实体:一种防止线性结构变形的方法,该方法是在融化的永冻土上的滑坡或人造斜坡上竖立的,包括安装工作现场,将桩安装到斜坡土壤中,将桩组合到单个格栅中。将桩浸入每个桩自由端的土壤中后,他们会安装一个钢筋混凝土头,然后通过安装垂直的土工格栅将土桩组合成一个格栅,该土工格栅牢固地连接到桩头和水平排列的土工格栅上在头顶上方。从桩头底部到水平土工格栅第一层的工作地点,以及土工格栅各层之间的缝隙均充满碎石并压实。水平土工格栅以局部排列的条件安装在不动的斜坡土或自然斜坡中。效果:防止在结构运行过程中永久冻土融化的情况下,在斜坡上的汽车和铁路变形,降低了材料强度,实现了抗滑坡作用。2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号